20 × 12 ft frame re-decked in composite
A 240 sq ft frame with 5.5 in. boards, a 3/16 in. gap, and boards running parallel to the house needs 26 rows of decking, about 520 linear ft of coverage, and roughly 572 linear ft of board once the waste allowance is added. Grooved composite at 16 in. joist spacing takes about 432 hidden clips.
25 × 10 ft re-deck in pressure-treated wood
Deck Bros published a pressure-treated re-deck at roughly $5,000 for a 25 × 10 ft deck, which is about $20 per sq ft installed. This planner lands the same footprint inside its planning band when you pick pressure-treated decking.
When the answer is not a re-deck
If the checklist comes back with rotted joists, a compromised ledger, or moving posts, the planner switches to a rebuild conversation. New decking is the cheapest part of a deck; hiding a failing frame under it is the most expensive mistake in this trade.
Is re-decking cheaper than building a new deck?
Yes, when the frame, posts, and footings are sound. You are paying for decking and installation instead of footings, posts, beams, joists, and the picture-frame border, which is why a re-deck is usually completed within a working day.
How do I know whether my frame can be reused?
Walk the deck and look for soft spots, dark streaks, a springy feel, stained siding above the ledger, or movement in posts and railings. The checklist above turns those observations into a reading, but it is a self-check and not a structural ruling — a free assessment that pulls a few boards gives you the real answer.
Why does the planner ask about hidden fastener clips?
Grooved composite, PVC, and hardwood boards fasten with clips at every joist crossing, and those clips are ordered by the box. Rows plus one clip per joist line is the count crews use to get close, so you can budget the fastener line instead of discovering it mid-build.
Can I re-deck over the old boards?
No. Deck Bros removes the existing decking so the joists, ledger, and hardware can be inspected before new boards go down. Layering new decking over old hides rot, traps moisture, and adds weight the frame was never sized for.
Do the numbers get sent anywhere?
No. The takeoff and the cost band are calculated in your browser and are never uploaded or stored. Use Copy plan or Download takeoff if you want to keep them, because nothing is saved when you close the tab.
Turn the takeoff into a fixed price
Deck Bros is a family-owned Omaha deck builder that installs new decking on existing structures across the Omaha metro, Lincoln, and Western Iowa. Estimates are free, many can be handled same-day over the phone, and installation work carries the same 5-year workmanship warranty as a full build.
Get Your QuoteSee what deck installation covers
Deck Resurfacing Planner · planning takeoff only · price guidance dated 2026-09-01. © 2026 Deck Bros.