Free planning tool · no account needed

Deck Footing and Concrete Calculator

Work out the footings before anyone digs: how many you need, where each one lands, how deep they go, how much concrete the whole job takes, and how many bags of mix that is in the sizes your supplier sells. Type the deck size, the post spacing you want, and the footing size, and the layout, the footing schedule, and the concrete order appear as you type. The math runs in your browser.

  • The footing math runs in your browser
  • Nothing you type is uploaded or stored
  • Planning numbers — confirm frost depth locally
Deck size

Measure the deck you want to build, outside post to outside post. The width is the side that runs along the house; the depth is how far the deck reaches into the yard.

Post and beam layout

The tool divides the width evenly, so the posts you get are always at or closer than this number. Wider spacing means fewer footings and more load on each one.

How far the joists or beams can span between support lines, which sets how many rows of footings a deck this deep needs. 12 ft is a common planning figure for a 2x10 frame at 16 in. on center.

A deck that attaches to a ledger uses the house as its first support line. Leave this unticked unless the deck stands on its own, such as a ground-level platform away from the wall.

Footing size

This starts at 42 in., the depth this tool uses as a planning default for the Omaha and Lincoln area. Local requirements commonly land between 36 and 48 in. — change it to the number your building department gives you.

The pier is the concrete that sits above the soil line so the post base stays out of the dirt; enter 0 for a footing that finishes flush with grade. Use the extra footings field for stair landings, a future hot tub, or anything else that needs its own pier.

Carried on top of the geometry for spillage, over-digging, and uneven holes. The tool reports the exact volume as well, so you can see both numbers.

Your footing plan

Enter the deck size, the post spacing, and the footing size, and the footing count, mark-out, schedule, and concrete order appear here. The defaults show a 16 ft by 12 ft deck on 12 in. footings so you can see the shape of the output before you measure.

How the deck footing calculator works

Measure the deck you want: the width along the house and the depth out into the yard. The tool divides the width into posts no further apart than the spacing you allow, then works out how many rows of posts that depth needs from the beam spacing you enter. Every row gets the same number of footings at the same positions, so the plan is easy to set out with a tape and a string line.

  1. Enter the deck size. Width along the house and depth out from the wall. A 16 ft by 12 ft deck is the default because it is a common single-beam layout.
  2. Set the post spacing. 8 ft on center is a common residential spacing. The tool divides the width evenly, so a 16 ft wide deck on 8 ft spacing lands posts at 0, 8, and 16 ft.
  3. Confirm the footing size and depth. The tool starts at a 12 in. round footing 42 in. below grade and 4 in. above it, and flags the plan when you go shallower or smaller. Both numbers are yours to change.
  4. Take the schedule. Read the mark-out, copy the plan, or download the footing schedule and hand it to whoever is digging and buying concrete.

Reading your footing numbers

Footing count is posts per row times the number of rows, plus any extra footings you added for stairs, a landing, or future work. A 16 ft by 12 ft deck on 8 ft post spacing needs one row of three footings: the ledger at the house carries the first support line, and the beam at the 12 ft mark carries the other. Make the deck 24 ft deep and the same spacing rules produce two rows of footings instead, because no single beam span is allowed to reach past 12 ft.

Concrete volume is simple cylinder arithmetic: the area of the circle times the depth, with the depth being the part below grade plus the pier above it. A 12 in. footing 42 in. deep with a 4 in. pier holds about 3.01 cu ft of concrete, which is just over five 80 lb bags before any waste allowance. The tool multiplies that by the footing count and then adds your waste percentage, and it shows the exact geometry total next to the order figure so nothing is hidden inside the allowance.

Bag counts use the yields the bagged mix manufacturers publish: an 80 lb bag makes about 0.60 cu ft of concrete, a 60 lb bag 0.45, a 50 lb bag 0.375, and a 40 lb bag 0.30. Bag counts are always rounded up, because you cannot buy part of a bag, and the table shows the weight you will actually be lifting so the job can be planned honestly.

Cubic yards matter once the job is big enough to order ready-mix. There are 27 cu ft in a cubic yard, and the tool rounds the order up to the nearest quarter yard, because that is how a plant will quote it. Mixing 60 bags by hand in a wheelbarrow is a long day; at that point a short-load delivery is usually the cheaper and more consistent option.

Worked examples

A 16 ft by 12 ft deck, 8 ft post spacing, 12 in. footings 42 in. deep. Three footings in one row 12 ft out from the house, at 0, 8, and 16 ft along the width. Each footing takes 3.01 cu ft of concrete with the 4 in. pier, so the geometry total is 9.03 cu ft and the order with 10% waste is 9.94 cu ft — 17 bags of 80 lb mix, or 34 bags of 40 lb.

A 24 ft by 20 ft deck, 8 ft post spacing, 12 in. footings. Four posts per row and two rows, at 10 ft and 20 ft out, so eight footings and 24.09 cu ft of geometry. With 10% waste that is 26.49 cu ft, about 0.98 cu yd — 45 bags of 80 lb mix, which is the point where most crews order ready-mix instead.

A freestanding 12 ft by 12 ft platform on 6 ft post spacing. Three posts per row at 0, 6, and 12 ft, and two rows because the deck carries its own beam at the house line, so six footings. Same 12 in. by 42 in. footing with a 4 in. pier gives 18.06 cu ft of geometry and 19.87 cu ft to order, which is 34 bags of 80 lb mix.

Frost depth and what this tool does not decide

Footings exist to get the deck past the frost line, where the soil stops moving seasonally. This tool starts from a 42 in. planning default for the Omaha and Lincoln area, where local requirements commonly land somewhere between 36 and 48 in. below grade. That number is a starting point for planning, dated 2026-10-16, not a code value: the depth your building department requires is the one that matters, and Western Iowa, Nebraska, and every other jurisdiction set their own.

What the tool does not do is just as important. It does not size the footing for the load it carries or check the soil it bears on, which is why 12 in. is treated as the usual residential planning size rather than a rule. It does not design the beam, post, or post base, does not check lateral load on tall piers, does not handle stepped or sloped sites, and does not decide whether your deck needs an engineer. Bay windows, cantilevers, hot tubs, and roof loads all change the load path, and those conversations belong with the contractor or the local authority — this tool gets you a first layout and a concrete order to plan around.

Deck footing questions homeowners ask

How many footings does a deck need?

One per post, and the posts are spaced along beams that carry the joists. A 12 ft deep deck usually needs one row of footings, because the ledger on the house takes the first support line. Deeper decks need a second row, and the tool adds rows until no span passes the beam spacing you enter. The count that comes out is the count you would mark out on site.

How deep should deck footings be?

Below the frost line, which is set locally. In this part of Nebraska, requirements commonly land between 36 and 48 in. below grade, and this tool starts at 42 in. Ask your building department for the number they enforce, then enter it — the concrete order follows the depth directly, so a 12 in. difference across eight footings is a few bags of mix.

How many bags of concrete per footing?

A 12 in. round footing 42 in. deep with a 4 in. pier takes about 3.01 cu ft, so five 80 lb bags covers it as bare geometry and six covers it with a 10% allowance. Shallower footings take fewer: at 36 in. of concrete the same footing is about 2.36 cu ft, which is four bags of 80 lb mix.

Should I use bagged mix or ready-mix?

Bagged mix is fine up to a few dozen bags, and it gives you time to set each footing as you dig it. Past roughly 40 bags the hauling and mixing is the slow part of the job, and a short-load delivery usually costs less than the labor and comes out more consistent. The tool reports both the bag counts and the cubic yards so you can price it either way.

Can I use the footing schedule to order concrete?

Yes. It lists every footing with its diameter, depth below grade, pier height, concrete volume, and where it sits on the plan, plus the mark-out distances and the bag counts for the sizes your supplier stocks. It does not include form tubes, rebar, post bases, or the gravel you may want under a footing, and it does not add a waste allowance for uneven digging beyond the percentage you enter.

Where this fits into a deck project

Footings are the first thing an in-house crew sets and the first thing that cannot be changed later without tearing up the yard. Having the count, the mark-out, and the concrete order in hand before the first hole is dug is what turns a quote into a schedule you can check, and it is the moment when comparing a bigger deck against a smaller one costs nothing.

Sizing the frame that sits on those footings is the next step. The deck cost calculator turns a deck size and material into a budget range, the deck stair calculator lays out the steps off the same height, and the deck railing calculator sizes the guard and its posts.

Have the footings and the deck built together

Deck Bros is a family-owned Omaha deck builder, and deck building starts from the ground up: foundation, footings, posts, picture frame, decking, and railing, with permits handled for you. Most decks are finished in about three days, every project carries a 5-year workmanship warranty, and estimates are free.